On 20 January 2027 the Machinery Regulation (EU) 2023/1230 replaces the Machinery Directive 2006/42/EC — with no transition period. I bring your technical purchasing conditions and company standards up to the new legal standard in good time: technically precise, legally sound.

20 minutes, free of charge & non-binding — choose a slot directly in the calendar.

20+ Years in industry & automation
20 January 2027 MVO applies from
111 Checks in commissioning checklist

Why now and not in 2027

The Machinery Regulation does not only affect machine builders. It affects every operator and purchaser whose orders are delivered and accepted after 20 January 2027. Those very orders are being written today — against rulebooks that almost without exception still refer to the Machinery Directive 2006/42/EC.

The result is a blind spot that was bound to happen: the supplier fully meets your technical purchasing conditions — and still delivers a machine that does not comply with the law in force at the time of delivery. The discussion about who retrofits it then takes place during commissioning. Under time pressure.

Updating a rulebook is not copy-editing but a technical task: it is about what evidence a supplier must provide in future, how cybersecurity and digital instructions for use are verified, and who bears manufacturer responsibility when several machines are assembled into a system.

As a generally sworn and court-certified expert with more than two decades in automation and robotics, I assess both — the legal position and the technical reality of your plant. Manufacturer-neutral.

Triggers, Key Questions, Deliverables

Typical triggers

  • Rulebook still refers to the Machinery Directive 2006/42/EC
  • Orders with delivery after 20 January 2027 are already in progress
  • Guideline or company standard not revised for years
  • Cybersecurity and digital instructions for use are missing from the rulebook
  • Uncertainty about “substantial modification” of existing plant

Key questions

  • Which passages are specifically affected — and how should they be changed?
  • What must the supplier demonstrate and provide in future?
  • How is MVO compliance verified at commissioning and acceptance?
  • Who bears responsibility when machines are assembled into a system?

Deliverables & formats

  • Gap list with the specific changes required for each passage
  • Approval-ready text proposals in tracked-changes mode (old/new)
  • Checklist for commissioning and acceptance (Excel/Word)
  • Review with the specialist department and presentation of results

Service packages (tier model)

Tier 1

Gap Check

Your rulebook systematically checked against the MVO (EU) 2023/1230 and the current state of standards — a reliable basis for decision-making.

Add-on: Management briefing

Tier 2

Full Update

Affected chapters revised as approval-ready text proposals in tracked-changes mode, including a commissioning checklist and a review with your team.

Add-on: Team training

Tier 3

Rulebook Radar

Ongoing monitoring of relevant changes in legislation and standards — with an annual update proposal, before auditors find the gap.

Add-on: Ad-hoc assessment

How it works

1

Initial meeting

20 minutes online: we review your existing rulebooks and clarify the scope and the result you want. You then receive a concrete quotation with a fixed delivery date.

2

Analysis

Systematic review of your documents against the MVO and the current state of standards. Each affected passage is recorded individually, assessed and annotated with the specific changes required.

3

Handover & review

Presentation of results and review with your specialist department. The text proposals are delivered approval-ready in tracked-changes mode — ready for immediate further use.

Frequently Asked Questions about the Machinery Regulation

What changes on 20 January 2027?

The Machinery Regulation (EU) 2023/1230 replaces the Machinery Directive 2006/42/EC. As a regulation, it applies directly in all Member States and no longer needs to be transposed into national law. What matters is the time of placing on the market: products placed on the market from 20 January 2027 must comply with the MVO.

Is there a transition period?

No. There is no coexistence phase in which deliveries could optionally be made under the old or the new legal basis. The long lead time since entry into force in 2023 is the transition period — it expires on 20 January 2027. Machines lawfully placed on the market before that date are unaffected.

Why does this affect my purchasing conditions today?

Because orders with delivery and acceptance dates after the cut-off date are being written now. A rulebook that refers to the Machinery Directive 2006/42/EC contractually binds the supplier to a legal basis that will have been repealed by the time of delivery. The supplier fulfils the contract — and still does not deliver MVO-compliant equipment. This gap does not close by itself.

What changes most in substance?

Four points shape day-to-day practice: cybersecurity and protection against corruption of control systems are explicitly required; the instructions for use may be provided digitally, subject to clear rules; software that modifies safety functions is covered in its own right; and for the high-risk products listed in Annex I, involvement of a notified body is mandatory in certain cases.

What does the new rule on “substantial modification” mean for existing plant?

Substantial modification is defined for the first time in the legal text of the regulation itself, and no longer only in interpretation papers. Anyone who substantially modifies existing plant — for example through conversion, linking or replacing the control system — takes on the obligations of a manufacturer for that plant. This directly affects operators and maintenance providers and belongs in every rulebook that governs conversions and retrofits.

How does a gap check work and what does it cost?

The effort depends on the scope and structure of your rulebook. In the 20-minute initial meeting we review your existing documents together and clarify the scope and the result you want. You then receive a concrete quotation with a fixed delivery date. The initial meeting is free of charge and non-binding.

Arrange your gap check now

Anyone receiving deliveries after 20 January 2027 needs the MVO in their rulebook today.