Home / Development & engineering
Mechanics, PLC, IT software and AI — in one system.
A deep understanding of IT combined with sound mechanical engineering knowledge: almost 100 machines built, from the robot cell to the series-ready, data-driven plant. Manufacturer-neutral and active worldwide.
Service areaWorldwide

// Services
The entire development of devices and machines — from concept to commissioning.
Concept
Requirements, plant concept and feasibility.
Cycle-time simulation
Check cycle times and bottlenecks before anything is built.
Digital twin
Test the control system and sequences on the virtual model.
Commissioning support
On-site support until the plant is up and running.
// When the plant is already running
Stabilise, modernise, safeguard
Plant not running stably
Production Stability
Identification of the causes of instability through analysis of digital control loops & MES synchronisation.
- Recurring faults in automated production lines
- Synchronisation problems between PLC, robotics and MES/ERP
- Stops with no mechanical findings
Repair, retrofit or new build
Retrofit & Consulting
Economic feasibility assessment including evaluation of software compatibility when replacing hardware.
- Performance, quality or safety deficits
- Ageing, spare-parts shortages, changes to standards
- Evaluation of supplier quotations and concept variants
MVO-Ready
Technical purchasing conditions and factory standards updated to the Machinery Regulation (EU) 2023/1230.
- Gap check against the Machinery Regulation and current standards
- Approval-ready text proposals in tracked-changes mode
- Commissioning checklist with 111 check points
// Competence matrix
Four pillars. Each one proven.
Robotics & special-purpose machinery
- Robot cell architecture (PROCELL)
- 6-axis articulated arm and delta kinematics
- Bin picking, gripper technology
- Collaborative robotics
- Hygienic Design
Machine vision & test technology
- 2D position detection on the fly
- 3D shape and surface inspection
- Electrical and high-voltage testing
- Inline inspection with AI sensing
- Ultrasonic methods
// References
Built, not just claimed
PROCELL
Base robot cell with standardised process modules. Adaptation to the customer's process through the choice of modules instead of a redesign.
// Current — key date 20 January 2027
MVO-Ready
If you will be supplied after 20 January 2027, you need the Machinery Regulation (EU) 2023/1230 in your rulebook today — with no transition period.
Stabilise plant performance?
Book an online meeting for an initial assessment of your project. 20 minutes, Mon–Thu, 1–4 pm.