# AmbroschTech GmbH — full website content as plain text > All public content of https://www.ambrosch.tech/en/ in one file. Summary with links: https://www.ambrosch.tech/en/llms.txt. German version: https://www.ambrosch.tech/llms-full.txt --- Source: https://www.ambrosch.tech/en/ // Mechanics · Automation · IT # Problem solving with foresight. And full commitment when it matters. We investigate and resolve complex technical problems in machinery, robotics and control systems in conjunction with IT. Expert opinions Independent, robust technical assessment for courts, law firms and insurers. To the expert opinions Development Develop, stabilise and modernise plant and machinery — from the single cell to series production. To development & engineering Interim Interim technical leadership for management, owners and investors. To interim management Not sure? Book a 20-minute meeting — we will work out together where your matter belongs. 20+ Years of experience ~100 Machines built 6 Court-certified fields // Roland Ambrosch Someone who first built plants, then instrumented them, then scaled them as a product can afterwards judge why someone else's plant does not work. Building machines Putting data to work Scaling a product Clarifying causes View biography // Key date 20 January 2027 ## MVO-Ready The Machinery Regulation (EU) 2023/1230 replaces the Machinery Directive — with no transition period. 63 Tage View gap check --- Source: https://www.ambrosch.tech/en/gutachten.html Home / Expert opinions # Every technical problem has a cause. We find it. As a generally sworn and court-certified expert, I provide clearly structured, soundly reasoned technical classifications of causes — on court instruction and as private expert opinions for companies, insurers and private individuals. Book a meeting Describe your matter in confidence Service area Austria & Germany, on site and remote ### Court certification - 60.25 Other machinery, plant — automation engineering and robotics - 60.27 Mechatronics - 60.46 Machine tools and production machinery - 60.53 Plant for food production - 68.80 Plant control systems, measurement and control engineering, PLCs All fields of expertise 100% Independence 6 Court-certified fields 11th year as an expert // Your situation ## Three routes to clarity In court or private ### Court-Ordered & Private Expert Opinions Legally robust and privately commissioned classification of causes. Including software-assisted fault chain analysis for machine and plant damage. - Disputes over the cause of failures or production defects - Delivery, warranty or performance commitments - Private preservation of evidence before or without proceedings Learn more Before it escalates ### Out-of-Court Resolution Neutral interface analysis (mechanics/software) to defuse conflicts and avoid litigation. - Escalating supplier or customer conflicts - Disagreements over performance, quality or acceptance - Need for an objective second opinion Learn more For insurers and policyholders ### Damage Analysis Cause assessment for swift claims settlement (possible software malfunction or OT cyber incidents). - Major machine failures with production downtime - Disputes over the cause of damage before settlement - Assessment of consequential damage and knock-on effects Learn more // Approach ## The Structured Analysis Process 1 ### Baseline Assessment Rapid, structured initial recording of the facts. Formation of hypotheses and a risk snapshot as first orientation. 2 ### In-Depth Analysis Detailed examination of causes and variants. Validation through measurement records and standards gap analysis. 3 ### Decision Paper Consolidated reasoning tailored to the recipient. A robust dossier for the court, board of directors or insurer. ### Efficient Dispute Resolution Through precise delineation of defects and a clear separation of responsibilities, we significantly shorten the duration of proceedings. ### Structured Analysis Planning certainty through proven, multi-stage analysis processes and transparent timelines for every expert opinion. ### In-Depth IT/OT Expertise Automation, robotics and the critical connection between software logic (OT) and IT interfaces for uncovering hidden fault chains. // From practice ## Three cases, one pattern Case 1 ### Tolerance At project start, dimensions were changed and approved under time pressure. Months later the parts deviated and the plant did not run. Lesson: agree a fallback option Case 2 ### Incoming inspection The processor waived the incoming inspection. A part arrived out of tolerance and the machine drove into it at full feed. Lesson: define the inspection scope in writing Case 3 ### Yardstick The complaint was that the plant used outdated technology. Ordered two years ago, one year of build time, and the trade-fair machine was a prototype from last week. Lesson: name the yardstick in the contract // Expertise & independence ## Court certification As a generally sworn and court-certified expert, Roland Ambrosch is obliged to investigate technical matters objectively and impartially. - 60.01 Scientific instruments, equipment electrical, optical testing & pressure testing - 60.25 Other machinery, plant Automation engineering and robotics - 60.27 Mechatronics Automation engineering and robotics - 60.46 Machine tools, production machinery Machines with automation engineering - 60.53 Machinery, plant for food production Plant with handling tasks and conveyor technology - 68.80 Plant control systems, measurement technology, control engineering and telecontrol technology, PLCs ## Need technical clarification? Book an online meeting for an initial assessment of your case. Book a meeting Send enquiry // The other areas Development Develop, stabilise, modernise plant and machinery Interim management Interim technical leadership --- Source: https://www.ambrosch.tech/en/entwicklung.html Home / Development & engineering # Mechanics, PLC, IT software and AI — in one system. A deep understanding of IT combined with sound mechanical engineering knowledge: almost 100 machines built, from the robot cell to the series-ready, data-driven plant. Manufacturer-neutral and active worldwide. Discuss a project Plants on video Service area Worldwide ~100 Machines built 6 Industries served 250 Burgers per hour (FABAL) −30% Engineering time // Services ## The entire development of devices and machines — from concept to commissioning. 1 ### Concept Requirements, plant concept and feasibility. 2 ### Cycle-time simulation Check cycle times and bottlenecks before anything is built. 3 ### Digital twin Test the control system and sequences on the virtual model. 4 ### Commissioning support On-site support until the plant is up and running. Discuss a project // When the plant is already running ## Stabilise, modernise, safeguard Plant not running stably ### Production Stability Identification of the causes of instability through analysis of digital control loops & MES synchronisation. - Recurring faults in automated production lines - Synchronisation problems between PLC, robotics and MES/ERP - Stops with no mechanical findings Learn more Repair, retrofit or new build ### Retrofit & Consulting Economic feasibility assessment including evaluation of software compatibility when replacing hardware. - Performance, quality or safety deficits - Ageing, spare-parts shortages, changes to standards - Evaluation of supplier quotations and concept variants Learn more Key date 20 January 2027 ### MVO-Ready Technical purchasing conditions and factory standards updated to the Machinery Regulation (EU) 2023/1230. - Gap check against the Machinery Regulation and current standards - Approval-ready text proposals in tracked-changes mode - Commissioning checklist with 111 check points Learn more // Competence matrix ## Four pillars. Each one proven. ### Robotics & special-purpose machinery - Robot cell architecture (PROCELL) - 6-axis articulated arm and delta kinematics - Bin picking, gripper technology - Collaborative robotics - Hygienic Design ### Machine vision & test technology - 2D position detection on the fly - 3D shape and surface inspection - Electrical and high-voltage testing - Inline inspection with AI sensing - Ultrasonic methods ### Manufacturing & process engineering - Laser marking 2D and 3D - Waterjet processing - Screw fastening and gluing - THT assembly - Packaging, sorting, labelling ### Data, software & AI - Data acquisition, breaking up silos - Computer vision as a product - Predictive Maintenance - PLC programming (Beckhoff) - AI-first way of working // References ## Built, not just claimed ProAutomation · 2010–2017 ### PROCELL Base robot cell with standardised process modules. Adaptation to the customer's process through the choice of modules instead of a redesign. Kapsch · 2019–2022 ### Smart Sensing Data acquisition, breaking up silos, inline quality inspection with AI and ultrasound. Traceability without serial numbers. REET Systems · 2023–2026 ### FABAL Fully autonomous, data-driven plant for burger preparation, taken to series maturity. 250 burgers per hour, 50+ non-uniform ingredients. ProCheck 9000 Assembly and testing ProSwitchtest Optical and electrical testing ProPlace THT assembly ProLaser 9000 Laser marking 2D and 3D ProChip 700 Electronics recycling ProSort 500 Grouping and cartoning ProPick Indexable inserts ProSort 200 Sorting and counting All 20 plant videos in the biography // Current — key date 20 January 2027 ## MVO-Ready If you will be supplied after 20 January 2027, you need the Machinery Regulation (EU) 2023/1230 in your rulebook today — with no transition period. 64 Tage until the Machinery Regulation applies View gap check ## Stabilise plant performance? Book an online meeting for an initial assessment of your project. 20 minutes, Mon–Thu, 1–4 pm. Discuss a project Send enquiry // The other areas Expert opinions Independent assessment for courts, law firms and insurers Interim management Interim technical leadership --- Source: https://www.ambrosch.tech/en/interim.html Home / Interim management # Technical leadership on an interim basis. Sixteen years at the interface of mechanics, automation and IT — as founder, division head and managing director. Evidenced by almost 100 machines built and teams of up to 35 people. Discuss a mandate View biography Service area Worldwide 35 Team led (max.) 1 → 21 Employees built up 1 → 12 Machines per year 2 Crescendo Awards // Typical mandates ## What you bring me in for Example 1 ### Integrating AI into engineering teams Embedding AI as a way of working in the team rather than as an individual tool — in design, PLC and software development. Reference: REET Systems — five AI domains in one product, AI-first way of working Example 2 ### Structuring fast-grown R&D and project management departments Organising roles, processes and responsibilities when the organisation is lagging behind growth. Reference: ProAutomation from 1 to 21 employees, REET with up to 35 people Example 3 ### Restructuring R&D for cost efficiency Standardising and modularising engineering so that development effort falls without losing substance. Reference: Kapsch — standardised bills of materials, engineering time −30% // Leadership roles ## Founded, led, scaled 2010–2017 ### ProAutomation GmbH Founder Started alone, grew to 21 employees. Output rose from one machine per year to twelve — financed from project cash flow, without outside capital. 2019–2022 ### Kapsch BusinessCom Head of the Digital Factory division Additionally head of the Digital Manufacturing group. Standardised, revision-controlled bills of materials in presales and costing cut engineering time by 30 per cent. 2023–2026 ### REET Systems GmbH Managing Director Took FABAL to series maturity. Up to 35 people: mechanical design, electrical engineering, PLC programming, assembly, IT software development, support and maintenance. A machine that, for me, technically surpasses everything seen so far — and that was almost 100 machines. // Leadership & build-up ## What I take on - 1 Founding and scaling From zero to 21 employees, financed from cash flow - 2 Multidisciplinary team leadership Mechanics, electrics, PLC, IT software, service - 3 Productisation From project to product business: PROCELL, FABAL - 4 R&D and funding strategy Including the innovation assistant - 5 International delivery - 6 Pitching and growth - 7 Analysis and structuring of operational teams Including management consulting Before the mandate or before the purchase ### Technical Due Diligence Structured risk profile to determine the future viability of software architecture and OT security. - Company or asset acquisition with a high share of technical plant - Hidden maintenance, retrofit or compliance risks - Realistic CAPEX/OPEX forecast after acquisition - Executive summary for the investment committee Learn more // References ## Externally confirmed Vienna Chamber of Commerce (WKO) ### Crescendo Awarded twice: Aufbruch category 2014 and Aufstieg category 2016 — for building up ProAutomation GmbH. ifm · SMC · Pilz ### FABAL Three independent automation suppliers have published the project as a reference of their own. Kapsch ### Digital Factory Customers: leading manufacturers in Germany, Austria and Switzerland — including Mondi and RHI. ## Looking for interim leadership? 20 minutes in an online meeting: we clarify your needs and define the optimal path to a solution. Available Mon–Thu, 1–4 pm. Discuss a mandate Send enquiry // The other areas Expert opinions Independent assessment for courts, law firms and insurers Development Develop, stabilise, modernise plant and machinery --- Source: https://www.ambrosch.tech/en/service-1-gerichtliche-gutachten.html #### Service 1 # Court-Ordered & Private Expert Opinions As a sworn and court-certified expert, I provide clearly structured, soundly reasoned technical classifications of causes — both on court instruction and as a private expert opinion for companies, insurers and private individuals. ### Typical Situations - Disputes over the cause of failures, production defects or safety incidents - Disputes concerning delivery, warranty or performance commitments - Assessment of alleged failed investments or consequential damage - Judicial clarification of technical matters (evidentiary order) - Private preservation of evidence before or without court proceedings - Independent assessment for insurers or internal decision-making ### Key Questions - What is the technically most probable primary cause of the damage or defect? - Was the contractually promised performance objectively achieved or missed? - Which causal chain links acts or omissions to the damage? - How can operator error, material defects and design or integration defects be distinguished from one another? - How should the condition (function, safety, standards compliance) be assessed during the relevant period? ### Deliverables & Formats - Court expert opinion (structured according to the evidentiary order) - Private expert opinion (freely commissioned, same quality standard) - Findings & inspection reports - Photo documentation / condition matrix - Cause-and-effect analysis (fault tree / event chain) - Executive summary for judges, management or insurers ### Service Packages (Tiered Model) | Tier | Scope | Add-ons | Baseline Assessment | File review, mapping of evidentiary questions, initial on-site inspection | Rapid photo documentation | In-Depth Analysis | Measurement reports, cause model (fault tree), differentiation of competing hypotheses | Extended material and functional tests | Decision Basis | Complete expert opinion in accordance with the evidentiary order, incl. key findings & appendices | Preparation for the hearing to explain the opinion / supplementary Q&A ## Need Technical Clarification? Book an online meeting for an initial assessment of your case. Book a meeting --- Source: https://www.ambrosch.tech/en/service-2-aussergerichtliche-klaerung.html #### Service 2 # Out-of-Court Technical Resolution I reduce time, costs and escalation risks through neutral technical conflict resolution before legal action is taken. ### Typical Situations - Escalating supplier or customer conflicts before legal steps are taken - Disagreements over performance, quality or acceptance conditions - Early neutral technical assessment to avoid litigation - Need for an objective second opinion ### Key Questions - What is the realistic technical performance status compared with the promised target? - Which neutral allocation of causes and responsibilities appears plausible? - What options exist for a low-conflict remedy? - Can a formalised dispute (expert opinion / court) be avoided? - Which evidence objectively strengthens your own negotiating position? ### Deliverables & Formats - Neutral condition & performance assessment - Short report on causes / responsibility matrix - Recommendation for action (options + effort + risk) - Data basis / measurement reports - Technical talking points for negotiations ### Service Packages (Tiered Model) | Tier | Scope | Add-ons | Baseline Assessment | Performance/condition deltas, stakeholder discussion, list of hypotheses | Short 2-hour workshop | In-Depth Analysis | Comparative measurements, document review, responsibility matrix, options and risk overview | Moderated conflict-resolution session | Decision Basis | Consolidated neutral basis for negotiation & resolution (scenarios, recommendation) | Support through two rounds of negotiation ## Defuse the Conflict Technically? Book an online meeting for an initial assessment of your case. Book a meeting --- Source: https://www.ambrosch.tech/en/service-3-versicherung-schadensanalyse.html #### Service 3 # Insurance Damage Analysis I provide a reliable technical basis for prompt and appropriate claims settlement without misattribution. ### Typical Situations - Major machine failures with production downtime - Disputes over the cause of damage before settlement (business interruption, property damage) - Assessment of consequential damage and knock-on effects - Clarification of the coverage relevance of technical causes ### Key Questions - What is the primary cause of the damage (technically valid)? - Which secondary and consequential damage can be causally attributed? - What remaining service life / repairability exists? - Which measures minimise follow-on risks and recurrence? - Which data supports or refutes the reported damage hypotheses? ### Deliverables & Formats - Technical damage report (cause / extent / causality) - Photo documentation / findings reports - Replacement versus repair assessment - Time and cost estimate for technical restoration - Recommended measures for risk reduction ### Service Packages (Tiered Model) | Tier | Scope | Add-ons | Screening | Initial inspection of the damage site, basic photo documentation, primary-cause hypotheses | Express 48-hour snapshot | Assessment | Dismantling / functional testing, causality of secondary damage, repair vs. replacement, restart risks | Laboratory tests / material analyses | Decision Basis | Complete technical damage report with causality & prioritisation of measures | Preparation for insurer / policyholder meeting ## Clarify the Claim Technically? Book an online meeting for an initial assessment of your case. Book a meeting --- Source: https://www.ambrosch.tech/en/service-4-ursachenanalyse-produktionslinien.html #### Service 4 # Root Cause Analysis for Production Lines (OT/IT Focus) I pinpoint the core technical and software-related causes of instabilities at the critical IT/OT interfaces. ### Typical Triggers - Recurring faults in automated production lines - Deviations in cycle time / quality caused by software logic errors - Synchronisation problems between PLC, robotics and the IT layer (MES/ERP) - Safety shutdowns / unexpected stops with no mechanical findings ### Key Questions - Which combination of technical / logical causes is producing the faults? - Is the cause in the software parameterisation or in the IT interfaces? - Which control / sensor / software bottlenecks dominate the failure pattern? - How robust are OT security and data integrity? - How do we prioritise fixes by impact / effort / risk? ### Deliverables & Formats - Fault-cause matrix (impact & frequency) - Signal trace & log file analysis - Interface analysis (mechanics / software / IT) - Action plan (quick wins vs structural measures) - Performance gap view (target vs actual KPIs) ### Service Packages (Tiered Model) | Tier | Scope | Add-ons | Baseline Assessment | Data / log sampling, bottleneck review, initial cause clusters | Remote data access setup | In-Depth Analysis | Signal / sequence analysis, OEE gap mapping, cause prioritisation, quick-win plan | On-site coaching for quick wins | Decision Paper | Consolidated stabilisation / optimisation strategy with roadmap & KPI path | 4-week follow-up monitoring ## Stabilise plant performance? Book an online meeting for an initial assessment of your case. Book a meeting --- Source: https://www.ambrosch.tech/en/service-5-technische-due-diligence.html #### Service 5 # Technical Due Diligence I reduce technical blind spots and quantify investment and modernisation risks to support well-founded purchasing decisions. ### Typical Triggers - Company / asset acquisitions (M&A) with a high share of technical plant - Investment in new production sites / lines - Assessment of technology risks where capital is tied up - Validation of scalability / retrofit potential before the purchase decision ### Key Questions - Technical condition and level of modernisation vs. the claimed level? - Hidden maintenance, retrofit or compliance risks? - Scalability and expandability of the core plant? - Realistic CAPEX/OPEX forecast after acquisition? - Which investments are mandatory in the first 12–24 months? ### Deliverables & Formats - Condition & risk assessment (criticality matrix) - CAPEX/OPEX estimation framework - Retrofit / upgrade roadmap - Compliance / security gap analysis - Executive summary for the investment committee ### Service Packages (Tiered Model) | Tier | Scope | Add-ons | Screening | Red-flag screening (condition / modernisation / obvious risks) | CAPEX/OPEX range check | Assessment | Asset review, risk & modernisation matrix, initial investment profile | In-depth compliance risk gap analysis | Decision Basis | Full technical DD with CAPEX/OPEX model, retrofit roadmap, executive summary | Presentation to the investment committee ## Minimise investment risks? Book an online meeting for an initial assessment of your project. Book a meeting --- Source: https://www.ambrosch.tech/en/service-6-retrofit-investitionsberatung.html #### Service 6 # Retrofit & Investment Advisory I identify the best investment option, both technically and economically, and prevent wrong decisions with long-term consequences. ### Typical Triggers - Decision: repair vs retrofit vs new build - Performance, quality and safety deficits in existing plants - Pressure to modernise: ageing, spare-parts shortages, changes to standards - Preliminary economic / CAPEX review of larger investments - Evaluation of technical supplier quotations and concept variants ### Key Questions - Is a retrofit technically sensible and economically justified? - Which option optimises performance, cost and risk? - Remaining service life, upgrade potential, failure and safety risks? - Reliability and substance of the supplier quotations? - Which measure secures capacity, availability and cost stability? ### Deliverables & Formats - Variant comparison (repair / retrofit / new build) - Economic & risk analyses (TCO, sensitivities) - Service life & condition assessment - Requirements / specification reconciliation - Decision papers for investment committees ### Service Packages (Tiered Model) | Tier | Scope | Add-ons | Screening | Baseline condition / performance survey, initial variant direction, rough remaining service life | Supplier quotation sanity check | Assessment | Variant & economic analysis (TCO / sensitivity), risk / performance matrix, upgrade potential | Extended scenarios (energy / CO2 / standards trends) | Decision Basis | Complete variant / investment dossier (comparison, roadmap, recommendation) | Support for board papers / committee pitches ## Avoid wrong decisions? Book an online meeting for an initial assessment of your project. Book a meeting --- Source: https://www.ambrosch.tech/en/mvo-ready.html // Service — Technical Rulebooks # MVO-Ready Technical purchasing conditions, updated with legal certainty. On 20 January 2027 the Machinery Regulation (EU) 2023/1230 replaces the Machinery Directive 2006/42/EC — with no transition period. I bring your technical purchasing conditions and company standards up to the new legal standard in good time: technically precise, legally sound. Book a gap check appointment One-pager as PDF 20 minutes, free of charge & non-binding — choose a slot directly in the calendar. 20+ Years in industry & automation 20 January 2027 MVO applies from 111 Checks in commissioning checklist ## Why now and not in 2027 The Machinery Regulation does not only affect machine builders. It affects every operator and purchaser whose orders are delivered and accepted after 20 January 2027. Those very orders are being written today — against rulebooks that almost without exception still refer to the Machinery Directive 2006/42/EC. The result is a blind spot that was bound to happen: the supplier fully meets your technical purchasing conditions — and still delivers a machine that does not comply with the law in force at the time of delivery. The discussion about who retrofits it then takes place during commissioning. Under time pressure. Updating a rulebook is not copy-editing but a technical task: it is about what evidence a supplier must provide in future, how cybersecurity and digital instructions for use are verified, and who bears manufacturer responsibility when several machines are assembled into a system. As a generally sworn and court-certified expert with more than two decades in automation and robotics, I assess both — the legal position and the technical reality of your plant. Manufacturer-neutral. ## Triggers, Key Questions, Deliverables ### Typical triggers - Rulebook still refers to the Machinery Directive 2006/42/EC - Orders with delivery after 20 January 2027 are already in progress - Guideline or company standard not revised for years - Cybersecurity and digital instructions for use are missing from the rulebook - Uncertainty about “substantial modification” of existing plant ### Key questions - Which passages are specifically affected — and how should they be changed? - What must the supplier demonstrate and provide in future? - How is MVO compliance verified at commissioning and acceptance? - Who bears responsibility when machines are assembled into a system? ### Deliverables & formats - Gap list with the specific changes required for each passage - Approval-ready text proposals in tracked-changes mode (old/new) - Checklist for commissioning and acceptance (Excel/Word) - Review with the specialist department and presentation of results ### Service packages (tier model) Tier 1 ### Gap Check Your rulebook systematically checked against the MVO (EU) 2023/1230 and the current state of standards — a reliable basis for decision-making. Add-on: Management briefing Tier 2 ### Full Update Affected chapters revised as approval-ready text proposals in tracked-changes mode, including a commissioning checklist and a review with your team. Add-on: Team training Tier 3 ### Rulebook Radar Ongoing monitoring of relevant changes in legislation and standards — with an annual update proposal, before auditors find the gap. Add-on: Ad-hoc assessment ## How it works 1 ### Initial meeting 20 minutes online: we review your existing rulebooks and clarify the scope and the result you want. You then receive a concrete quotation with a fixed delivery date. 2 ### Analysis Systematic review of your documents against the MVO and the current state of standards. Each affected passage is recorded individually, assessed and annotated with the specific changes required. 3 ### Handover & review Presentation of results and review with your specialist department. The text proposals are delivered approval-ready in tracked-changes mode — ready for immediate further use. ## Frequently Asked Questions about the Machinery Regulation What changes on 20 January 2027? The Machinery Regulation (EU) 2023/1230 replaces the Machinery Directive 2006/42/EC. As a regulation, it applies directly in all Member States and no longer needs to be transposed into national law. What matters is the time of placing on the market: products placed on the market from 20 January 2027 must comply with the MVO. Is there a transition period? No. There is no coexistence phase in which deliveries could optionally be made under the old or the new legal basis. The long lead time since entry into force in 2023 is the transition period — it expires on 20 January 2027. Machines lawfully placed on the market before that date are unaffected. Why does this affect my purchasing conditions today? Because orders with delivery and acceptance dates after the cut-off date are being written now. A rulebook that refers to the Machinery Directive 2006/42/EC contractually binds the supplier to a legal basis that will have been repealed by the time of delivery. The supplier fulfils the contract — and still does not deliver MVO-compliant equipment. This gap does not close by itself. What changes most in substance? Four points shape day-to-day practice: cybersecurity and protection against corruption of control systems are explicitly required; the instructions for use may be provided digitally, subject to clear rules; software that modifies safety functions is covered in its own right; and for the high-risk products listed in Annex I, involvement of a notified body is mandatory in certain cases. What does the new rule on “substantial modification” mean for existing plant? Substantial modification is defined for the first time in the legal text of the regulation itself, and no longer only in interpretation papers. Anyone who substantially modifies existing plant — for example through conversion, linking or replacing the control system — takes on the obligations of a manufacturer for that plant. This directly affects operators and maintenance providers and belongs in every rulebook that governs conversions and retrofits. How does a gap check work and what does it cost? The effort depends on the scope and structure of your rulebook. In the 20-minute initial meeting we review your existing documents together and clarify the scope and the result you want. You then receive a concrete quotation with a fixed delivery date. The initial meeting is free of charge and non-binding. ## Arrange your gap check now Anyone receiving deliveries after 20 January 2027 needs the MVO in their rulebook today. Choose a slot in the calendar Prefer to write? Send an enquiry via the contact form. --- Source: https://www.ambrosch.tech/en/kontakt.html # Get in Touch Describe your matter in confidence. You will receive an initial response on scope and approach. ### Direct Enquiry Use the form below to submit your project details in a structured way, or contact us directly. Name* Email* Company name Address Subject* Message* * Required fields. Your data will be treated confidentially. Direct contact: office@ambrosch.tech Location: Esslinger Hauptstraße 64/701 1220 Vienna, Austria Service area: Expert opinions: Austria & Germany Development & interim: worldwide On site and remote LinkedIn: Roland Ambrosch ### Online Meeting Gain immediate clarity through a 20-minute online meeting with the expert. We clarify your needs, check the technical plausibility and define the best path to a solution. - 20-minute online meeting (video call) - Initial expert assessment - Available Mon–Thu, 1:00 pm – 4:00 pm Choose an appointment in the calendar --- Source: https://www.ambrosch.tech/en/biography/ AmbroschTech ← Back to website Biography of Roland Ambrosch · roland@ambrosch.tech BIOGRAPHY · AS OF 08/2026 # KNOW-HOW. ROLAND AMBROSCH. Sixteen years at the interface of mechanics, automation and IT — evidenced by almost 100 machines built, 20 plant videos, a peer-reviewed publication and teams of up to 35 people. ProAutomation GmbH Kapsch REET Systems GmbH AmbroschTech GmbH 1 — OVERVIEW ## THE ARC. FOUR STAGES, ONE AXIS. The stages are not a zigzag. They are a deepening along the same axis: the interface between mechanics, automation and IT. 2010–2017 ### BUILDING MACHINES ProAutomation GmbH, Vienna. Founded out of a sole proprietorship. From one to 21 employees, from one to twelve machines per year — financed from its own cash flow. 2019–2022 ### PUTTING DATA TO WORK Kapsch BusinessCom, Head of Digital Factory division. Breaking up data silos, inspecting inline, capturing with camera and microphone what no serial number reveals. Customers include Mondi and RHI. 2023–2026 ### SCALING A PRODUCT REET Systems GmbH, Managing Director. Took FABAL to series maturity — mechanics, PLC, IoT, IT software and AI in one system. Up to 35 people. SINCE 2016 ### CLARIFYING CAUSES AmbroschTech GmbH. Court-certified expert, in the 11th year, recertified in 2026. The main focus since June 2026. Anyone who first built machines, then instrumented them, then scaled them as a product can subsequently judge why someone else's machine does not work. 2 — OVERVIEW ## IN NUMBERS. WHAT IS DOCUMENTED. ~100 MACHINES BUILT 35 TEAM LED (MAX.) 6 INDUSTRIES SERVED 2 CRESCENDO AWARDS 6 CERTIFIED FIELDS OF EXPERTISE 11th YEAR AS COURT-CERTIFIED EXPERT Sources: LinkedIn profile and posts, YouTube channels of ProAutomation GmbH and Roland Ambrosch, trade press, Crossref, reetgroup.com, ambrosch.tech. The complete mapping of evidence to each statement is disclosed on request. 3 — COMPETENCE MATRIX ## SIX PILLARS. EACH WITH EVIDENCE. ### ROBOTICS & SPECIAL-PURPOSE MACHINERY - ■ Robot cell architecture (PROCELL) - ■ 6-axis articulated arm and delta kinematics - ■ Bin picking, gripper technology - ■ Collaborative robotics - ■ Feeding and conveying technology - ■ Hygienic Design ### MACHINE VISION & INSPECTION TECHNOLOGY - ■ 2D position detection on the fly - ■ 3D shape and surface inspection - ■ Optical quality inspection - ■ Electrical and high-voltage testing - ■ Inline inspection with AI sensing - ■ Ultrasonic methods ### MANUFACTURING & PROCESS ENGINEERING - ■ Laser marking 2D and 3D - ■ Waterjet machining - ■ Screwing and bonding - ■ Desoldering and material separation - ■ THT assembly - ■ Packaging, sorting, labelling ### DATA, SOFTWARE & AI - ■ Data acquisition, breaking up silos - ■ Computer vision as a product - ■ Predictive Maintenance - ■ Demand Forecasting - ■ PLC programming (Beckhoff) - ■ AI-first way of working ### LEADERSHIP & BUILD-UP - ■ Founding and scaling - ■ Multidisciplinary team leadership - ■ International delivery - ■ R&D and funding strategy - ■ Pitching and growth - ■ Productisation ### ASSESSMENT & STANDARDS - ■ Court certification - ■ Root Cause Analysis - ■ IT/OT interface analysis - ■ Machinery Regulation 2023/1230 - ■ Functional safety - ■ OT-Security, IEC 62443 CHAPTER 1 ## PROAUTOMATION. 2010 TO 2017. Founded in Vienna in 2010 out of a sole proprietorship, joined by two partners in 2011. Started alone, grew to 21 employees. Output rose from one machine per year to twelve — financed from project cash flow, without external capital. This is where the entire technical foundation was laid: robot cells for handling, assembly, inspection, packaging and material separation. Eighteen videos document it. CHAPTER 1 — PROAUTOMATION ## THE COMPANY. IN ITS OWN WORDS. ProAutomation — About Us Founding, growth and the PROCELL principle — the core company video. CRESCENDO 2016 — Advancement Category Application video for the WKO Wien entrepreneur award — the award in the Advancement category followed. A look back at growth, cash-flow financing and expansion goals. Clicking the still image starts the player. The videos are hosted on YouTube and are only loaded on click. CHAPTER 1 — PROAUTOMATION ## PROCELL. THE DECISIVE LEVER. PROCELL is a basic robot cell onto which standardised process modules are mounted. The founder describes it as a modular system — Lego for adults. PRINCIPLE ### MODULAR SYSTEM Feeding, handling and inspection are already in place. Adaptation to the customer process is done by choosing modules rather than by a new design. EFFECT ### SETUP TIME Process-reliable implementation in less time. Explicitly named as the basis for ProPlace, ProPick and ProSwitchtest. SIGNIFICANCE ### PRODUCT The transition from project business to product business. The same mindset reappears years later at FABAL. CHAPTER 1 — PROAUTOMATION ## HANDLING. PICKING WHAT LIES UNSORTED. ProBinPick Bin picking: bulk material from transport containers, magnetic grippers and suction cups. Metal, automotive, electronics, pharma. ProPick Indexable inserts on coating carriers. Different geometries, variable placement patterns. PROCELL basis. ProSort 200 Sorting, counting and orderly placing of small parts up to 0.5 kg — without changeover, without vibratory bowl feeders. CHAPTER 1 — PROAUTOMATION ## ASSEMBLY AND INSPECTION. IN THE SAME CYCLE. ProCheck 9000 Assembly and simultaneous inspection of electrical appliances, transmission controls, LEDs and circuit boards. Screwing and bonding. ProSwitchtest Optical and electrical inspection of circuit breakers with variable pole counts. High voltage, torque, variable labelling. ProPlace — THT Through-hole mounting of leaded components on printed circuit boards. PROCELL basis with automated feeding. CHAPTER 1 — PROAUTOMATION ## FOOD. THE CONSISTENT FOCUS. ProBack 1000 Delta robots pack doughnuts (Krapfen) and simultaneously inspect shape and surface with a 3D camera. Hygienic design. ProPetline Pet food line for aluminium trays: packing, drying, labelling — including label inspection. ProWaterjet Fully automatic scoring of dough pieces with a waterjet and camera technology. Last documented new development. CHAPTER 1 — PROAUTOMATION ## BREADTH. PACKAGING, COLLABORATING, RECOVERING. ProSort 500 Grouping and cartoning of sachets. Up to 60 sachets per minute per module, scalable in 3-shift operation. SAWYER at the Schnittomat Collaborative robot Sawyer operates an existing machine. Shown at the SMART 2016 trade fair. ProChip 700 Camera detects the circuit board variant, robot inserts it, special station separates the chip. Electronics recycling. CHAPTER 1 — PROAUTOMATION ## TECHNOLOGY AND CONTEXT. TWO PIECES OF EVIDENCE. ProLaser 9000 Laser robot cell for housing marking. Two unique selling points: no holding fixture needed, no expensive focusing device — the robot takes over its function. 2D and 3D. CheckPoint Presents ProAutomation Third-party feature by the funding consultancy CheckPoint. Evidences breadth of industries, the doughnut line as an ongoing project, and the funding strategy including the innovation assistant. CHAPTER 2 · APPROX. 2019–2022 ## KAPSCH BUSINESSCOM. DIGITAL FACTORY. Head of the Digital Factory division, additionally head of the Digital Manufacturing group. The step from the machine level to the data level: no longer solely the question of how a part is moved — but what is known about the part while it is moving. Customer base: leading manufacturers in Germany, Austria and Switzerland from paper, steel, electronics, oil & gas as well as discrete manufacturing and process industry — including Mondi and RHI by name. Besides Smart Sensing, Energy Management 4.0 is the unit's second publicly documented field: measuring the energy footprint, using sensors to uncover hidden consumption of electricity, liquids and compressed air, linking consumption to machine and order data. Up to 20 per cent savings in cooling and heating processes. “Connecting machines and IT systems digitally to optimize manufacturing industries is what we do.” CHAPTER 2 — KAPSCH ## THE DEMO CELL. TWO LANGUAGE VERSIONS. KAPSCH — Smart Manufacturing (DE) German version. Data acquisition, breaking up silos, inline quality inspection with AI and ultrasound. KAPSCH — Smart Manufacturing (EN) English version. Identical content. Reference application: In goods-inward inspection, pharma vials are automatically checked for inclusions, chipping and streaks. Defective parts are ejected. This solves a twofold problem — the manual effort and the fact that manual quality judgements are not consistent. CHAPTER 2 — KAPSCH ## WHAT CHANGES. MACHINE TO DATA. | PROAUTOMATION UNTIL 2017 | KAPSCH 2020 | The machine moves and inspects the part | The machine knows something about the part | Camera detects position and shape | Sensing captures what is hidden | Inspection as a separate station | Inspection inline in the flow | Machine as an island | Data silos are dissolved | Result: good part or bad part | Result: data and good part or bad part This intermediate stage explains why the later REET architecture was not conceived as robotics with software bolted on — and why the expert work focuses on the IT/OT interface, of all things. CHAPTER 2 — KAPSCH BUSINESSCOM ## SMART SENSING. THE DIGITAL FINGERPRINT. Traceability without serial or batch numbers. Parts of the same kind differ in fine details — with wood, the grain. Camera and microphone record them several times along the production line. This produces a unique fingerprint that even survives heat in the oven and water treatment. ### FOUR FIELDS OF APPLICATION - ■ Quality Improvement — better products through 100% inspection - ■ Production Optimization — OEE growth, higher throughput - ■ Anomaly Detection — noticing the smallest deviations - ■ Predictive Maintenance — reacting hours before a failure ### THREE WORKSTREAMS - ■ Increase availability — retrofit sensing, platform integration - ■ Reduce scrap — automatic detection of the machine setup - ■ Optimise quality — camera systems, back-end analytics, alerting ### PROJECT APPROACH - ■ Site inspection and on-site survey of the existing situation - ■ Evaluation of the sensing required - ■ Joint field trial at the customer - ■ Worldwide rollout, remote management, plant comparison In addition, a competence emerged here that does not arise in machine building: industrialising engineering processes themselves. Converting the presales and costing chain to standardised, revision-controlled bills of materials cut engineering time by 30 per cent. CHAPTER 3 · 04/2023–06/2026 ## REET SYSTEMS. ROBOTICS AS A PRODUCT. Managing Director of REET Systems GmbH, Vienna. Product: FABAL, a fully autonomous, data-driven system for burger preparation, taken to series maturity. The company was founded in 2019 in the shareholder environment of the Theophil Group, which holds the Burger King master franchise in Austria. Responsible for a deliberately broad team of up to 35 people: mechanical design in SolidWorks, electrical engineering in EPLAN, PLC programming on Beckhoff, assembly and electrical work, an in-house IT software development team, as well as support and maintenance with its own management. “A machine that, for me, technically surpasses everything seen so far — and that was almost 100 machines.” CHAPTER 3 — REET SYSTEMS ## THE BRAIN. FIVE AI DOMAINS. 1 ### FORECASTER Demand forecast up to 30 days ahead, automatic inventory adjustment, live dashboards for bottleneck detection. Supply Chain 2 ### INSPECTOR High-resolution cameras and neural networks check every ingredient for size, colour and freshness consistency. Vision 3 ### SENTINEL Prediction of component failures up to seven days ahead, maintenance during off-peak times. Maintenance 4 ### CO-PILOT Sequencing of production tasks, coordination of robot movements, staffing recommendations in real time. Operations 5 ### AGENT Central dashboard, recipes with versioning and rollback, order tracking, complete remote operation. Management Source: reetgroup.com, retrieved on 31 August 2026. CHAPTER 3 — REET SYSTEMS ## THE MODEL. PAY PER BURGER. -50% STAFF COSTS 24/7 AVAILABILITY <1% FOOD WASTE +33% PROFITABILITY 0 EUR UPFRONT INVESTMENT DAY 1 ROI-START A usage model instead of a machine sale demands technical availability guarantees. That is why predictive maintenance here is not an additional feature but a prerequisite of the business model. Figures according to reetgroup.com. Target availability of the machines: 99.5 per cent. CHAPTER 3 — REET SYSTEMS ## FABAL IN NUMBERS. EXTERNALLY CONFIRMED. 250 BURGERS PER HOUR 50+ VARIED INGREDIENTS 3 SUPPLIERS WITH CASE STUDY PARTNER ### IFM Sensing. According to a trade article in MM MaschinenMarkt Österreich, it plays a central role in the system. Trade article 07/2026 PARTNER ### SMC Drive and pneumatic technology. Own application report on highly automated, modular and scalable burger production. Application report 03/2026 PARTNER ### PILZ Functional safety. Own trade article on the safety design of the system. Trade article Series-ready, modularly adaptable to restaurant concepts, realised at standard kitchen sizes and demonstrable at the Wiener Neudorf demo centre. Three independent automation suppliers have published the project as their own reference. CHAPTER 3 — REET SYSTEMS ## FABAL ON VIDEO. THE ASSEMBLY LINE IN ACTION. FABAL — the fully automated assembly line Short video from Reet Systems on FABAL, the fully automated burger assembly line. Click the still to start the player. The video is hosted on YouTube and only loaded on click. CHAPTER 4 · SINCE APPROX. 2016, NOW THE MAIN FOCUS ## AMBROSCHTECH. NAMING THE CAUSE. Problem solving with foresight. And full commitment when it matters. AmbroschTech GmbH analyses the interfaces between mechanics, automation and IT — and resolves complex technical problems in machines, robotics and control systems in connection with IT. Manufacturer-neutral, in Austria and Germany. Recertified in May 2026 and thus in the 11th year of practice. Recertification takes place every five years and examines professional competence, ongoing training and personal suitability — in Austria not a nice-to-have, but a statutory proof of quality. CHAPTER 4 — AMBROSCHTECH ## CERTIFICATION. THE OFFICIAL CONFIRMATION. ### SPECIALIST GROUP 60 — MACHINERY - ■ 60.01 Scientific instruments — electrical, optical testing, pressure testing - ■ 60.25 Other machines, plants — automation and robot technology - ■ 60.27 Mechatronics — automation and robot technology ### SPECIALIST GROUP 60 — CONTINUED - ■ 60.46 Machine tools and production machinery with automation technology - ■ 60.53 Food production plants — handling and conveying technology - ■ Specialist group 68 — Information technology - ■ 68.80 Plant controls, measurement technology, control and telecontrol engineering, PLC ### SERVICES - ■ Court-ordered and private expert opinions - ■ Out-of-court resolution - ■ Damage analysis for insurers - ■ Production stability and MES synchronisation - ■ Technical due diligence - ■ Retrofit and investment advice - ■ Machinery Regulation readiness before 20 January 2027 The list of fields of expertise is the direct official confirmation of the competence matrix: 60.53 mirrors ProBack, ProPetline and ProWaterjet. 60.01 mirrors ProSwitchtest and the Kapsch inspection technology. 68.80 mirrors the control and software level. CHAPTER 4 — AMBROSCHTECH ## REFERENCE CASE. TWELVE GAPS, ALL CLOSED. A large Austrian energy supplier had its technical procurement guideline for instrumentation and control (EMSR) technology checked line by line against the Machinery Regulation (EU) 2023/1230. ### GAPS FOUND - ■ Outdated references - ■ Missing cybersecurity - ■ No provisions for safety-relevant software - ■ No clear provisions for substantial modifications ### DELIVERABLES - ■ All twelve gaps documented - ■ Every gap closed with a concrete text proposal - ■ Comparison against the current state of standards - ■ Gap list plus alternative wording ### RESULT - ■ Rulebook already compliant with the Machinery Regulation today - ■ Every order placed on the law of tomorrow - ■ Deadline 20 January 2027 — no transitional period - ■ Reference case for service 7, Machinery Regulation readiness Such rulebooks sit exactly between two worlds. The legal department does not understand the technology, and the engineers do not understand the text of the regulation. It is exactly at this boundary that I like to work most. CHAPTER 4 — AMBROSCHTECH ## FROM PRACTICE. THREE CASES, ONE PATTERN. CASE 1 ### TOLERANCE At project start, dimensions were changed and waved through under time pressure. Months later the parts deviated and the machine did not run. The question examined is whether the new parts were allowed to deviate — and whether the original parts would have caused the same fault. Takeaway: agree a fallback option CASE 2 ### INCOMING INSPECTION The processor relied on the specification and skipped incoming inspection. A part arrived out of tolerance and the machine ran into it at full feed rate. Supplier, processor — or proportionately? Takeaway: define the scope of inspection in writing CASE 3 ### BENCHMARK The complaint was that the machine used old technology. The contract review showed: ordered two years ago, one year of build time, the trade-fair device a prototype from last week. Takeaway: name the benchmark in the contract Three benchmarks, three worlds: generally recognised rules of technology — proven, tested, safe. State of the art — current, established in practice. State of science — the very forefront, often not yet ready for series production. Anyone who specifies this cleanly in the contract spares themselves the discussion later. 5 — EVIDENCE ## EVIDENCE FROM THIRD PARTIES. PUBLICATION AND PRESS. PEER REVIEW ### SPRINGER 2019 Pamminger, Glaser, Ambrosch, Genner: Upscaling of Collaborative Disassembly Lines for Mobile Phones — Economic and Environmental Considerations. Proceedings of the International Symposium for Production Research, Lecture Notes in Mechanical Engineering, pp. 442–451. DOI 10.1007/978-3-030-31343-2_39 AWARD ### CRESCENDO Awarded twice by WKO Wien: Start-up category 2014 and Advancement category 2016 — for building up ProAutomation GmbH from zero to 21 employees. WKO Wien RESEARCH ### OBERSERVER Listed as a security-research-relevant reference: computer vision algorithms for detecting potentially suspicious objects — the earliest evidence of image processing beyond production. KIRAS context In addition, trade articles and expert comments in Die Presse, Der Standard, Trending Topics, MM MaschinenMarkt Österreich and FoodTec Insider, a case study at OpenBOM and a podcast appearance on the smart factory. The scientific work on collaborative disassembly lines is the continuation of what was built at ProAutomation as ProChip 700. 5 — SYNTHESIS ## THE SYNTHESIS. WHAT IS RARE. The rare quality is not a single line of the competence matrix, but vertical continuity. 6 Assessment — court-proof classification of causes, standards, OT security 5 Business model — pay-per-use, ROI, availability guarantee 4 AI models — forecasting, vision, predictive maintenance, fleet control 3 Data — acquisition, breaking up silos, inline inspection 2 Control — PLC, machine vision, inspection technology 1 Mechanics — grippers, kinematics, feeding, hygienic design Six levels, traversable in both directions. That is exactly the prerequisite for unravelling a hidden chain of faults — and that is exactly the business model. The most robust single figure for it: almost 100 machines built. Anyone who has been responsible for that many machines does not judge someone else's machine from theory. ## EVERY PROBLEM HAS A SOLUTION. This page is the visible part of a consistently evidenced body of documentation: biography, competence matrix, reference projects, technology register, industry catalogue, publications and video index. Every statement carries its source. roland@ambrosch.tech · ambrosch.tech